Completed Hisense dual-split air-conditioning installation on a stone house
RECENT PROJECT · AIR CONDITIONING

Hisense dual-split installation in a traditional stone house

Two indoor units connected to one outdoor unit, with dedicated electrical protection, discreet service routes and complete commissioning.

THE BRIEF

Comfort for two rooms without compromising the character of the property.

Reactive Resource installed a Hisense dual-split system serving a bedroom and the main living room. The work included a dedicated RCBO, insulated refrigeration pipework, condensate drainage, electrical connections, vacuum testing, commissioning and operational checks of both indoor units.

FROM PLANNING TO COMMISSIONING

The work, step by step.

Planning and positioning
01

Planning and positioning

Positioning both indoor units and preparing the service routes across the stone wall.

Dedicated electrical protection
02

Dedicated electrical protection

A dedicated Schneider Resi9 C16, 30 mA, Type F SI RCBO was added for the air-conditioning system.

Refrigeration pipe preparation
03

Refrigeration pipe preparation

Careful preparation of the insulated copper pipework and connections before controlled tightening.

Condensate drainage
04

Condensate drainage

Installation and securing of the drains with suitable fall and a tidy external finish.

Vacuum and system checks
05

Vacuum and system checks

Checks on both circuits, evacuation and verification before commissioning.

Bedroom indoor unit
06

Bedroom indoor unit

An indoor unit discreetly integrated into a bedroom with exposed beams.

Living-room indoor unit
07

Living-room indoor unit

The second indoor unit serves the living room while respecting the character of the house.

Completed outdoor unit and tidy service trunking
COMMISSIONED & TESTED

Two comfortable rooms, one efficient system.

Both indoor units were commissioned and checked in operation. The completed installation provides independent room control while keeping the external equipment and service routes neat and unobtrusive.